Electrical Install / by Kiwanda Sound Recordings

The home stretch. According to local building code, all conduit must be run at least 2' down in the ground. Not sure why, that's the code, so I dug a 35' long trench along the side of our space. Half the length was sand, the other half was large rocks and mud. Go figure. I believe we ran 4, 6, and 8 gauge wire between the exterior 200 amp breaker and the interior one, but don't quote me on that. I know all of the outlets were run on 12/2, with independent circuits for each except 2 in the live room. The lights were run separately on 14/2, CR and booth sharing a circuit, live room on its own. I had a couple friends with expertise help with terminating the connections, but all the grunt wire runs were performed by yours truly.
The lights in the CR are in two separate groups, 3 white, 2 blue, with their own respective dimmer switches. A three way switch controls the booth, with a dimmer inside. We also installed an exterior light and outlet.

Transient
Transient
Transient
Transient
Transient
Transient
Transient
Transient
Transient